首页|涉江取水泵房深基坑施工技术研究

涉江取水泵房深基坑施工技术研究

扫码查看
随着我国社会经济与建筑工程施工技术的发展,促进了各类大型项目工程的建设与发展,深基坑施工技术也随之快速发展.基坑工程面临的周围环境条件复杂多样,所采取的应对措施也不尽相同,以广西扶绥第二自来水厂取水工程取水泵房基坑工程施工为例,在阐述施工工艺流程和主要施工方法的基础上,对围堰填筑施工、地下水控制、基坑开挖、和基坑支护的施工要点进行研究.
Research on Construction Technology of Deep Foundation Pit for Water Intake Pump House Crossing the River
With the development of China's social economy and construction technology,it has promoted the construction and development of various large-scale projects,and the construction technology of deep foundation pits has also developed rapidly.The surrounding environmental conditions faced by foundation pit engineering are complex and diverse,and the response measures taken are also different.Taking the water intake project of Guangxi Fushui Second Water Plant as an example,this paper elaborates on the construction process and main construction methods,and studies the key construction points of cofferdam filling construction,groundwater control,foundation pit excavation,and foundation pit support.

crossing the rivercofferdam fillingdeep foundation pit constructionpump house

裴瑞、党昱明

展开 >

中国水利水电第十四工程局有限公司,云南 昆明 650041

涉江 围堰填筑 深基坑施工 泵房

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(1)
  • 6