山区高速公路项目前期工作中设计优化的思路

扫码查看
我国高速公路工程发展迅速,多数项目从立项到通车往往仅需几年的时间,但随着项目的快速推进,设计过程中欠考虑的地方也逐渐暴露出来.主要以施工技术角度考虑并结合现场实际情况,分别从桥改路、线型调整、预制T梁长度优化、材料调整等方面分析,对山区高速公路项目前期工作中设计优化思路进行分析,提出相应建议.
Design Optimization Ideas in the Preliminary Work of Mountain Expressway Projects
The development of highway engineering in our country is rapid,and most projects only take a few years from approval to opening to traffic.However,with the rapid progress of projects,the problems that were not considered in the design process are gradually exposed.Mainly from the perspective of construction technology and combined with the actual situation on site,this paper analyzes the design optimization ideas in the early stage of mountainous expressway projects from the aspects of bridge reconstruction,line adjustment,prefabricated T-beam length optimization,material adjustment,and puts forward corresponding suggestions.

mountain expresswaypreliminary workdesign optimization

肖文杰、张成祥

展开 >

中国水利水电第十四工程局有限公司,云南 昆明 650041

山区高速公路 前期工作 设计优化

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(1)
  • 9