Quality Management of Urban Water Environment Treatment Projects
This paper introduces the slotting construction of urban water environment comprehensive treatment engineering(buried pipes),the unique construction characteristics and quality control process in urban streets.According to the five major processes and two 100%inspection requirements,this paper summarizes the quality control points of(buried pipe)slotting construction and explores the methods of quality management during the construction process.Finally,the quality management issues and experiences during the construction process were summarized and discussed.
HDPE pipetrenchburied pipefive major processes100% inspection