Construction Safety Control of Manual Digging Pile in Huzhuang Bridge
Manual digging pile is considered a highly dangerous profession in construction.The central pile number of Huzhuang Bridge is ZK24+390/YK24+421,with a total length of 654 m on the left and 652 m on the right.The bridge route is divided into left and right sections.Due to the fact that the construction site is an open-air and densely populated production site,with high human machine mobility and numerous unsafe factors,accidents are prone to occur.Therefore,it is of utmost importance in safety management and must be foolproof.How to manage the safety of manual excavation pile construction is a topic that every construction manager must face seriously.To address some predictive safety risks that may occur during the construction process,this article mainly starts from the overall actual construction environment and construction risks of the project,and proposes some reference basis for on-site safety management measures.