针对红鱼洞水库不对称高陡、高缓岸肩施工百米级沥青混凝土心墙的特点,为减少过渡料和沥青料的施工干扰等不利影响,选用一体式联合摊铺机,对过渡料和沥青混凝土的同一层不分段、一次性完成摊铺成型.通过对拌和、运输、摊铺、碾压、缝面处理等主要工序的最优施工工艺及参数总结,有效控制了沥青心墙施工质量,缩短了施工工期,节省施工成本,取得较好成效.
Test and Application of Construction Parameters for Asphalt Concrete Core Walls
Hongyudong Reservoir has the characteristics of asymmetric high steep and high gentle bank shoulder construction with a hundred-meter asphalt concrete core wall.To reduce adverse effects such as construction interference from transition materials and asphalt materials,an integrated joint paver is selected to complete the paving and shaping of the same layer of transition materials and asphalt concrete in one go without segmentation.By summarizing the optimal construction techniques and parameters for the main processes of mixing,transportation,paving,rolling,and joint surface treatment,the construction quality of asphalt core walls has been effectively controlled,the construction period has been shortened,construction costs have been saved,and good results have been achieved.

asphalt core wallconstruction parameterexperimental applicationintegrated joint paver

成毅峰

展开 >

中国水利水电第四工程局有限公司,青海 西宁 810007

沥青心墙 施工参数 试验应用 一体式联合摊铺机

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(2)
  • 7