Reinforcement Structure and Construction Method of Zhangzhuang Aqueduct in Qingzhou City
To ensure the integrity of cultural heritage aqueducts during reinforcement construction,this article proposes a new aqueduct reinforcement structure and construction method,and compares and analyzes the technical advantages of steel aqueducts.Combining with the practical application of the Zhangzhuang Aqueduct Reinforcement Project in Qingzhou,the steel structure aqueduct is pre-fabricated and the lifting construction speed is fast.Steel pipes are installed in the steel structure aqueduct,and the connection between the steel pipes and the tank body forms a combination of steel pipes and concrete tank body.During the construction process,the displacement of the aqueduct was 0.52-3.68 mm,which is less than the design requirements.This method solves the technical difficulties and safety hazards in existing technologies,shortens the construction period,and improves the construction quality.