首页|瑞丽江一级水电厂励磁系统升级改造

瑞丽江一级水电厂励磁系统升级改造

扫码查看
瑞丽江一级水电站励磁系统选用南瑞电力控股股份公司产品的NES-5100 微机励磁系统,该励磁系统已运行超过 12 a,但由于装置逐渐老化、性能下降故需要对励磁控制系统进行改装,新改建的励磁控制系统则选用由南瑞电力控股股份公司产品的NES-6100 微机励磁控制系统,系统由NES6100 调节器、FLZ可控硅整流柜、FLM灭磁开关柜、等机柜组成.通过了各种测试检验,该系统顺利通过静调实验,动态试验,其各项性能指标符合标准及设计要求,且各性能指标符合标准和技术要求.
Upgrading and Renovation of Excitation System for Ruilijiang First Class Hydropower Plant
The excitation system of Ruilijiang First Class Hydropower Station adopts the NES-5100 microcomputer excitation system from Nanrui Power Holding Co.,Ltd.The excitation system has been in operation for over 12 years.Due to the gradual aging and performance degradation of the device,it is necessary to modify the excitation control system.The newly renovated excitation control system will use the NES-6100 microcomputer excitation control system.The system consists of NES6100 regulator,FLZ thyristor rectifier cabinet,FLM demagnetization switch cabinet,and other cabinets.The system has passed various tests and verifications,and has successfully passed static and dynamic tests.Its various performance indicators meet the standards and design requirements,and all performance indicators meet the standards and technical requirements.

Ruilijiang First Class Hydropower Stationexcitation systemNES-6100renovation

吕稳龙、王程凯、徐勃

展开 >

云南联合电力开发有限公司,云南 昆明 650000

瑞丽江一级水电厂 励磁系统 NES-6100 改造

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(2)
  • 1