Analysis and Treatment of High Head Inability to Open the Water Delivery Gate of Navigation Lockin Taoyuan Hydropower Station
The working gate of the lock water gallery is an important metal structure equipment and facility for completing the filling and discharging of the lock chamber.During the navigation process of the ship lock,filling and discharging water into the lock chamber to meet the navigation needs is directly related to the normal operation of the ship lock.The study focuses on the problem of high head failure to open the water conveyance corridor of Taoyuan Hydropower Station,analyzes the reasons for failure,and proposes improvement suggestions and measures.
navigation lockwater conveyance corridor working doorhigh headhydraulic hoistuplift force