首页|桃源水电站船闸输水门高水头不能开启分析及处理

桃源水电站船闸输水门高水头不能开启分析及处理

扫码查看
船闸输水廊道工作闸门是完成闸室充泄水的重要金结设备设施,其在船闸通航过程中对闸室进行充泄水从而满足通航需要,它直接关系到船闸正常运行.以桃源水电站船闸输水廊道工作高水头不能开启问题为研究对象,分析不能开启的原因,提出改进建议和措施.
Analysis and Treatment of High Head Inability to Open the Water Delivery Gate of Navigation Lockin Taoyuan Hydropower Station
The working gate of the lock water gallery is an important metal structure equipment and facility for completing the filling and discharging of the lock chamber.During the navigation process of the ship lock,filling and discharging water into the lock chamber to meet the navigation needs is directly related to the normal operation of the ship lock.The study focuses on the problem of high head failure to open the water conveyance corridor of Taoyuan Hydropower Station,analyzes the reasons for failure,and proposes improvement suggestions and measures.

navigation lockwater conveyance corridor working doorhigh headhydraulic hoistuplift force

邓顺亚

展开 >

中国水电顾问集团桃源水电厂,湖南 常德 415000

船闸 输水廊道工作门 高水头 液压启闭机 启门力