Intelligent Monitoring and Feedback of the Entire Process of Main Powerhouse Rock Anchor Beam Bridge Crane Test
Two 550t/100t single trolley bridge cranes with rock wall crane beams are installed in the main building of TB hydropower station.In order to understand its structural stress state and ensure the safe and stable operation of the bridge crane,fully intelligent automatic monitoring and feedback are carried out on the monitoring section during the bridge crane load test(static load and dynamic load).The results indicate that all monitoring indicators during the experiment were within the design warning values.It proves that the structure and shape of the rock wall crane beam in the main factory building are reasonable,safe and reliable.
rock anchor beambridge crane testintelligent monitoringfeedback