Research on Construction Technology of New Flood Control and Storage Pump Sluice on North Embankment
Huibo Avenue section of North Embankment has a high drainage pressure,leading to frequent flooding in the vicinity,and there is an urgent need to build a new pumping station.The construction of the pumping station project in this area requires strong technical requirements,a short construction period,and a narrow construction site.In order to ensure construction progress and quality,the construction procedure of the pumping station project should be reasonably planned,with a focus on controlling earthwork,foundation treatment,and concrete construction technology.These measures have achieved good construction results,solved the key and difficult points of construction,ensured the construction period and quality,and successfully reduced construction energy consumption.
water conservancy constructionpump station engineeringconstruction difficultieskey technology