首页|北堤新建防洪调蓄泵闸建设施工技术研究

北堤新建防洪调蓄泵闸建设施工技术研究

扫码查看
北堤惠博大道堤段排涝压力较大,导致附近涝灾时有发生,急需新建泵站.该区域泵站工程施工要求技术性强,施工期短,施工场地狭小,为了保证施工进度和质量,对泵站工程的施工程序进行合理规划,着重控制土方、基础处理以及混凝土施工技术,达到了良好的施工效果,解决了施工重点难点,保障工期和质量,成功减少了施工能耗.
Research on Construction Technology of New Flood Control and Storage Pump Sluice on North Embankment
Huibo Avenue section of North Embankment has a high drainage pressure,leading to frequent flooding in the vicinity,and there is an urgent need to build a new pumping station.The construction of the pumping station project in this area requires strong technical requirements,a short construction period,and a narrow construction site.In order to ensure construction progress and quality,the construction procedure of the pumping station project should be reasonably planned,with a focus on controlling earthwork,foundation treatment,and concrete construction technology.These measures have achieved good construction results,solved the key and difficult points of construction,ensured the construction period and quality,and successfully reduced construction energy consumption.

water conservancy constructionpump station engineeringconstruction difficultieskey technology

林佳蓉、吴创涛

展开 >

惠州大堤北堤管理中心,广东 惠州 516000

水利建设 泵站工程 施工难点 关键技术