Application of Refined Management in the Construction of Rock Wall Beams in Jixi Pumped Storage Power Station
Rock wall beam is the most difficult and demanding part of the excavation construction of the underground powerhouse.The fine construction concept was integrated into the construction of rock wall beam of underground powerhouse in Jixi Hydropower Station.Through reasonable layering,planning the excavation sequence,and precise control and adjustment of each key process,the key points of rock wall beam excavation operation are summarized to achieve quality control in the rock bench excavation process.This paper also improves the safety monitoring and protection measures during the excavation stage of the rock wall beam,ensuring that the fine management has achieved good application results in the excavation process of the underground powerhouse of Jixi Hydropower Station,and ensuring the excavation quality of the project.
rock wall beamunderground powerhouseJixi Hydropower Stationrefined construction