首页|水土流失量预测工作中的实地测量技术

水土流失量预测工作中的实地测量技术

扫码查看
建设工程中一系列施工活动中,使原有的水土保持功能降低,甚至完全丧失,造成新增加的水土流失.如不及时采取有效的防治措施,项目区内的水土流失必将加剧.首先介绍了造成水土流失的成因,阐述了现有水土流失预测方法,并结合具体工程实例,详细探讨了水土流失量预测工作中的实地测量技术,得到了水土流失量,有效地预防和控制了工程建设造成的水土流失,以期解决水土保持的难题,进而丰富水土保持防治方法和技术体系.
On Site Measurement Techniques in Predicting Soil Erosion
A series of construction activities in construction projects have reduced or even completely lost the original function of soil and water conservation,resulting in new soil erosion.If effective prevention and control measures are not taken in a timely manner,soil erosion in the project area will inevitably intensify.Firstly,the causes of soil erosion were introduced,and the existing methods for predicting soil erosion were elaborated.Combined with specific engineering examples,the field measurement techniques in predicting soil erosion were discussed in detail,and the amount of soil erosion was obtained.This effectively prevented and controlled soil erosion caused by engineering construction,aiming to solve the problem of soil and water conservation and enrich the methods and technical system for soil and water conservation prevention and control.

soil erosionfield measurementpredictionmethod of calculation

谢宇、张连刚

展开 >

浙江清源工程技术有限公司,浙江 杭州 310020

水土流失 实地测量 预测 计算方法

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(4)
  • 16