首页|引水隧洞施工围岩的变形特征研究

引水隧洞施工围岩的变形特征研究

扫码查看
广东省HY饮水工程的引水隧洞所处地质条件复杂,隧洞开挖后,围岩出现了多种变形现象,如顶拱下沉、底板隆起、侧壁内移、掉块等.就该引水隧洞施工围岩的变形特征进行分析,包括围岩物理力学性质测试、变形机理分析、变形特征影响因素分析等,以保障工程顺利进行.
Research on Deformation Characteristics of Surrounding Rock During Construction of Diversion Tunnels
The geological conditions of the diversion tunnel of Guangdong HY Drinking Water Project are complex.After excavation,various deformation phenomena occur in the surrounding rock,such as sinking of the top arch,uplift of the bottom plate,internal displacement of the side walls,and falling of blocks.This paper analyzes the deformation characteristics of the surrounding rock during the construction of the diversion tunnel,including testing of the physical and mechanical properties of the surrounding rock,analysis of the deformation mechanism,and analysis of the influencing factors of the deformation characteristics,in order to ensure the smooth progress of the project.

diversion tunnelsurrounding rock deformationphysical and mechanical propertiesdeformation

丰威

展开 >

福建省中材九龙江投资有限公司,福建 漳州 363000

引水隧洞 围岩变形 物理力学性质 变形特征

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(4)
  • 10