Research on the Construction Technology of High Pressure Bored Piles for Risk Removal and Reinforcement Project of Guanlan River Main Stream
This paper focuses on the construction technology of drilling and grouting piles for the reinforcement project of Guanlan River main stream,and explores key aspects such as drilling construction methods,steel cage installation,and concrete quality control under soft soil conditions.Through on-site investigation and analysis,technical points and improvement measures during the construction process of drilled grouting piles were proposed to ensure the construction quality and safety of the project.
Guanlan Riverrisk removal and reinforcement projecthigh pressure bored pilequality monitoring