Relocation and Construction Plan of Ailian River Channel Based on Hydrodynamic Model
With the continuous development of Chinese economic construction and social living standards,municipal projects such as urban rail transit are also constantly improving and have also achieved good development.Taking Ailian River relocation project as an example,this paper uses Mike 11 model to analyze the current situation of the project and proposes targeted river relocation plans and flood control projects.On the premise of not lowering the flood control standards of the current river channel,the current river channel will be relocated and modified to meet the construction needs of Longcheng Station.At the same time,the rainwater connected along the line will be collected,and the existing river interception pipes built in the current box culvert will be synchronously relocated.It provides necessary guarantees for building an integrated comprehensive transportation hub,facilitating passenger transfer between different lines,and ensuring the passenger flow guarantee of rail transit lines.
hydrodynamic modelriver relocation and constructionrainwater pipe relocationriver flood control