洮河三甲水电站枢纽工程地质条件与评价

扫码查看
洮河三甲水电站运行至今已有24a,需进行泵站更新改造,故要对洮河三甲水电站工程区基本地质条件及存在的工程地质问题进行评价分析,主要是从地形地貌、地层岩性、物理地质现象、地质构造与不良地质现象、水文地质等方面进行全面论述,对库区渗漏、水库浸没与库岸稳定等地质问题进行评价,进一步对坝基及坝肩等地质条件进行分析和评价,为下一步水电站更新改造提供技术指导.
Geological Conditions and Evaluation of Taohe Sanjia Hydropower Station Key Project
Taohe Sanjia Hydropower Station has been in operation for 24 years and requires pump station renovation and renovation.Therefore,it is necessary to evaluate and analyze the basic geological conditions and existing engineering geological problems of Taohe Sanjia Hydropower Station project area.This paper mainly comprehensively discusses the terrain,lithology,physical geological phenomena,geological structures and adverse geological phenomena,hydrogeology,and other aspects.It evaluates geological problems such as reservoir leakage,reservoir immersion,and reservoir bank stability in the reservoir area.Furthermore,it analyzes and evaluates the geological conditions of the dam foundation and shoulder,providing technical guidance for the next step of hydropower station renovation.

hydropower stationkey projectreservoir areaengineering geological conditiongeological evaluation

黄登伟

展开 >

甘肃甘兰水利水电勘测设计院有限责任公司,甘肃 兰州 730000

水电站 枢纽工程 水库库区 工程地质条件 地质评价

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(5)
  • 9