某引水工程调蓄水池滑坡专项治理工程设计

扫码查看
调蓄水池在施工期遇到滑坡而无法实施,工程建设无法正常推进,这将影响工程建设进度和工程整体建成后的效益发挥.静宁田堡调蓄水池滑坡设计变更后工程将正常施工并早日建成,对早日发挥工程效益起积极作用.设计变更后滑坡治理部位施工主要为抗滑桩工程,产生的土方主要用于调蓄水池筑坝,无多余弃土方,对渣场容量和设置基本无影响,施工征占地的数量稍有增加,施工区也不会由于设计变更而产生生物量的损失,在采取科学措施后将不会产生新的水土流失.
Design of Special Treatment Project for Reservoir Landslide in a Water Diversion Project
During the construction period,the regulating reservoir encountered landslides and could not be implemented,which would affect the progress of the project and the overall efficiency of the project after completion.After the design change of the landslide inJingning Tianbao Reservoir,the project will proceed with normal construction and be completed as soon as possible,which will have a positive impact on the early realization of project benefits.After the design change,the construction of the landslide control site mainly involves anti slip pile engineering,and the generated soil is mainly used for the construction of water storage tanks and dams.There is no excess abandoned soil,which has little impact on the capacity and setting of the slag yard.The number of construction land acquisition has slightly increased,and there will be no loss of biomass in the construction area due to the design change.After taking scientific measures,there will be no new soil erosion.

reservoirlandslide control

把余英

展开 >

甘肃省水利水电工程局有限责任公司,甘肃 兰州 734100

调蓄水池 滑坡治理

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(5)
  • 10