Design of Special Treatment Project for Reservoir Landslide in a Water Diversion Project
During the construction period,the regulating reservoir encountered landslides and could not be implemented,which would affect the progress of the project and the overall efficiency of the project after completion.After the design change of the landslide inJingning Tianbao Reservoir,the project will proceed with normal construction and be completed as soon as possible,which will have a positive impact on the early realization of project benefits.After the design change,the construction of the landslide control site mainly involves anti slip pile engineering,and the generated soil is mainly used for the construction of water storage tanks and dams.There is no excess abandoned soil,which has little impact on the capacity and setting of the slag yard.The number of construction land acquisition has slightly increased,and there will be no loss of biomass in the construction area due to the design change.After taking scientific measures,there will be no new soil erosion.