Structural Design and Construction Diversion Method of a New Water Sluice
A new medium-sized water gate will be built to replace the current 5-hole water gate in Jingtou Village in the Moon Bay Basin,and will be jointly dispatched with the planned flood interception project,the current Qiyi Water Gate,and the planned pumping station to form a complete flood control and drainage system in the Moon Bay Basin.Starting from the site selection of the water gate and the overall layout of the project,this paper compares detailed schemes in terms of the structure type,number of water gate holes,and foundation treatment of the water gate,and selects a suitable engineering design scheme for the water gate.It also carries out engineering layout for the selected water gate structure and main buildings,providing technical support for the design and construction of engineering water gates.
new medium-sized water sluicestructural designconstruction diversioncofferdam design