某抽水蓄能电站上水库工程特性研究

扫码查看
某抽水蓄能电站地质条件复杂,库容较大,渗漏问题突出.为研究上水库库盆的防渗方案,分析了上水库库盆渗流特性,并结合规范校核库盆渗漏量是否满足要求.采用AutoBank研究了上水库大坝的稳定、应力应变特性.
Study on the Characteristics of the Upper Reservoir Engineering of a Pumped Storage Power Station
A pumped storage power station has complex geological conditions,large storage capacity,and prominent leakage problems.In order to study anti-seepage scheme of the upper reservoir basin,the seepage characteristics of the upper reservoir basin were analyzed,and the leakage amount of reservoir basin was checked to see if it meets the requirements in accordance with the specifications.The stability and stress-strain characteristics of the upper reservoir dam were studied using AutoBank.

pumped storage power stationupper reservoir seepagestablestress-strain