Research on the Installation and Burying Construction Method of Single Drilling and Multiple Branch Seepage Pressure Gauges for Ultra Long Tunnels
Installing multiple seepage pressure monitoring sensors in the same direction at different parts of an ultra long hydraulic tunnel is currently the mainstream technical solution for safety monitoring in water conservancy and hydropower engineering.The installation and deployment of multiple seepage pressure sensors in the vertical facing holes at the top of the tunnel has become a common problem in the field of water conservancy and hydropower engineering monitoring technology.Through research and practice,it has been proven that this construction method has the advantages of simple installation,real-time efficiency,shortened construction period,and cost savings in production.
ultra long tunnelosmotometersingle boreholemultiple branchesconstruction method