云南水力发电2024,Vol.40Issue(5) :135-137.DOI:10.3969/j.issn.1006-3951.2024.05.033

不同采集水头对灯泡贯流式机组运行工况的影响分析

Analysis of the Influence of Different Collection Heads on the Operating Conditions of Bulb Tubular Units

张勋 时志能 葛荣
云南水力发电2024,Vol.40Issue(5) :135-137.DOI:10.3969/j.issn.1006-3951.2024.05.033

不同采集水头对灯泡贯流式机组运行工况的影响分析

Analysis of the Influence of Different Collection Heads on the Operating Conditions of Bulb Tubular Units

张勋 1时志能 2葛荣1
扫码查看

作者信息

  • 1. 五凌电力有限公司东坪水电厂,湖南 益阳 413500
  • 2. 湖南五凌电力科技有限公司,湖南 长沙 410004
  • 折叠

摘要

在保证电站安全稳定运行的基础上,对某电站 1 号机组开展基于毛水头、净水头的优化运行性能分析.通过对比低水头、高水头条件下的机组有功、协联关系、主要稳定性数据,从而评价机组在哪类设置水头具有更优的综合经济效益,以便后期指导机组开展水头采集优化的提质增效工作.

Abstract

On the basis of ensuring the safe and stable operation of the power plant,this paper conducts an optimized operational performance analysis of Unit 1 of a certain power plant based on gross water head and net water head.By comparing the active power,coupling relationship,and main stability data of the unit under low and high head conditions,it evaluates which type of head setting of the unit has better comprehensive economic benefits,in order to guide the unit to carry out quality and efficiency improvement work in head collection optimization in the later stage.

关键词

采集水头/功率增加/稳定性/灯泡贯流式机组

Key words

collection head/power increase/stability/bulb tubular unit

引用本文复制引用

出版年

2024
云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951