Analysis of the Influence of Different Collection Heads on the Operating Conditions of Bulb Tubular Units
On the basis of ensuring the safe and stable operation of the power plant,this paper conducts an optimized operational performance analysis of Unit 1 of a certain power plant based on gross water head and net water head.By comparing the active power,coupling relationship,and main stability data of the unit under low and high head conditions,it evaluates which type of head setting of the unit has better comprehensive economic benefits,in order to guide the unit to carry out quality and efficiency improvement work in head collection optimization in the later stage.
collection headpower increasestabilitybulb tubular unit