Metal Structure Layout and Design of Zangao Hydropower Station Project
Zangao Hydropower Station is the second stage diversion type hydropower station developed by Yerqiang River cascade.There are a large number of metal structure equipment and their distribution is scattered.This paper mainly introduces the layout of the metal structure of Zangao Hydropower Station project,the selection of the hoist,the structural design of the gate,and the ideas and methods of embedded part design.At present,the power station has been operating safely for more than 2 years,and the metal structure equipment is safe and reliable,which has certain guiding significance for the development and construction of subsequent diversion type power stations.
diversion type hydropower station engineeringgatehoistembedmentlayoutdesign