云南水力发电2024,Vol.40Issue(5) :184-187.DOI:10.3969/j.issn.1006-3951.2024.05.047

錾高水电站工程金属结构布置与设计

Metal Structure Layout and Design of Zangao Hydropower Station Project

杨健
云南水力发电2024,Vol.40Issue(5) :184-187.DOI:10.3969/j.issn.1006-3951.2024.05.047

錾高水电站工程金属结构布置与设计

Metal Structure Layout and Design of Zangao Hydropower Station Project

杨健1
扫码查看

作者信息

  • 1. 新疆水利水电勘测设计研究院有限责任公司,新疆 乌鲁木齐 830000
  • 折叠

摘要

錾高水电站为叶尔羌河梯级开发的第二级引水式水电站,金属结构设备数量较多,分布分散,主要介绍錾高水电站工程金属结构的布置、启闭机的选型、闸门的结构设计及埋件设计的思路和方法.目前电站已安全 2+a,金属结构设备安全可靠,对后续引水式电站开发建设,有一定的指导意义.

Abstract

Zangao Hydropower Station is the second stage diversion type hydropower station developed by Yerqiang River cascade.There are a large number of metal structure equipment and their distribution is scattered.This paper mainly introduces the layout of the metal structure of Zangao Hydropower Station project,the selection of the hoist,the structural design of the gate,and the ideas and methods of embedded part design.At present,the power station has been operating safely for more than 2 years,and the metal structure equipment is safe and reliable,which has certain guiding significance for the development and construction of subsequent diversion type power stations.

关键词

引水式水电站工程/闸门/启闭机/埋件/布置/设计

Key words

diversion type hydropower station engineering/gate/hoist/embedment/layout/design

引用本文复制引用

出版年

2024
云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
参考文献量8
段落导航相关论文