大型立轴水轮发电机组A修主轴拆装工具研发及工艺优化

Development and Process Optimization of a Special Tool for Disassembling and Assembling the Main Shaft in A Repair of a Large Vertical Axis Water Turbine Generator Set

刘亚军
云南水力发电2024,Vol.40Issue(6) :48-50.DOI:10.3969/j.issn.1006-3951.2024.06.018

大型立轴水轮发电机组A修主轴拆装工具研发及工艺优化

Development and Process Optimization of a Special Tool for Disassembling and Assembling the Main Shaft in A Repair of a Large Vertical Axis Water Turbine Generator Set

刘亚军1
扫码查看

作者信息

  • 1. 云南华电鲁地拉水电有限公司,云南 昆明 650228
  • 折叠

摘要

水轮发电机组转动部分拆卸与回装是机组A修的重要工序,直接影响检修工期.以鲁地拉水电站为例针对机组转动部分各段主轴拆卸及回装工艺进行优化,缩短水轮发电机组A修工期,提高检修效率,为机组检修提供经验和参考.

Abstract

The disassembly and reinstallation of the rotating part of water turbine generator set is an important process for Unit A maintenance,which directly affects the maintenance schedule.Taking Ludila Hydropower Station as an example,this paper optimizes the disassembly and reinstallation process of each section of the main shaft in the rotating part of unit.It can shorten the maintenance period of hydroelectric generator unit A,improve maintenance efficiency,and provide experience and reference for unit maintenance.

关键词

水轮发电机组/A修/主轴/专用工具/工艺优化

Key words

water turbine generator set/A maintenance/main shaft/special tool/process optimization