兰州市北滨河西延段工程1号桥施工监控技术要点
Key Points of Construction Monitoring Technology of No.1 Bridge in Lanzhou Beibinhe West Extension Project
李文华1
作者信息
- 1. 兰州交通大学土木工程学院,甘肃 兰州 730000;兰州交通大程检测有限公司,甘肃 兰州 730000
- 折叠
摘要
兰州市北环线工程全长约 22.5 km,1 号桥上部结构采用钢桁架桥,为确保施工中钢桁架结构的安全,在研究桥梁施工技术方案的基础上,分析了施工监控的要点和难点,详细介绍了 1 号桁架桥施工中的施工监控技术,通过现场监测数据对高架桥施工进行技术把控,从而保证了桥梁施工安全.
Abstract
The total length of Lanzhou North Ring Road Project is about 22.5km,and the upper structure of No.1 Bridge adopts a steel truss bridge.To ensure the safety of steel truss structures during construction,based on the study of bridge construction technology schemes,this paper analyzes the key points and difficulties of construction monitoring,and provides a detailed introduction to the construction monitoring technology in the construction of No.1 truss bridge.Through on-site monitoring data,technical control of elevated bridge construction is carried out to ensure bridge construction safety.
关键词
1号桥/施工方案/顶推风险/施工监控/数据分析Key words
No.1 Bridge/construction plan/push risk/construction monitoring/data analysis引用本文复制引用
出版年
2024