Analysis and Application of Filling Grouting Technology in Reinforcement of Hekou Reservoir
This paper mainly discusses the application of filling grouting technology in the reinforcement of Hekou reservoir.Firstly,the current situation of the project is described in detail,and then the dam seepage safety review calculation is carried out to evaluate the current safety situation.Then,the various steps of dam grouting construction are discussed in depth,including hole forming,pulping,grouting,re grouting,final grouting and hole sealing.These steps are to ensure the stability and safety of the dam body.In general,it provides an effective method to improve and strengthen the reservoir dam to prevent possible safety risks.