首页|三洲榕南干渠应急引水加压泵站建设实践

三洲榕南干渠应急引水加压泵站建设实践

扫码查看
随着全球气候变化的影响日益显著,各地的水资源状况也在不断发生变化,干旱是其中最为突出的问题之一.加压泵站的建设可以有效提高水资源利用效率,解决水资源在空间和时间上的分布不均,提高水资源的利用效率和保护效果在抗旱工作中发挥着至关重要的作用.以榕南干渠输水管线建设工程为背景,探讨在引水抗旱下,如何进行干渠输水管线的建设,结合工程背景进行了必要性分析,提出了泵站布置方案如泵站选址、型式设计,加压泵站建设控制要点等等,该工程项目的建设旨在优化水资源配置,保障城市发展,为周边地区的农业生产和生活用水提供稳定可靠的水源,为抗旱工作的顺利进行做出贡献.
Construction Practice of Emergency Diversion Boosting Pump Station for Sanzhou Rongnan Canal
With the increasingly significant impact of global climate change,the water resource situation in various regions is also constantly changing.Drought is one of the most prominent issues.The construction of booster pump stations can effectively improve the efficiency of water resource utilization and solve the uneven distribution of water resources in space and time.Improving the utilization efficiency and protection effect of water resources plays a crucial role in drought resistance work.Against the background of the construction project of Rongnan Canal water pipeline,this article explores how to construct the main canal water pipeline under the conditions of water diversion and drought resistance.It conducted a necessity analysis based on the engineering background and proposed pump station layout plans such as pump station site selection,type design,and control points for pressurized pump station construction.The construction of this engineering project aims to optimize water resource allocation,ensure urban development,provide stable and reliable water sources for agricultural production and domestic use in the surrounding areas,and contribute to the smooth progress of drought resistance work.

water diversion to fight droughtconstruction of booster pump stationwater resource utilization

万向斌

展开 >

河南省水务规划设计研究有限公司汕头分公司,广东 汕头 515000

引水抗旱 加压泵站建设 水资源利用

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(7)