首页|河床式电站增效扩容改造提升实践

河床式电站增效扩容改造提升实践

扫码查看
介绍了合江水电站增效扩容改造实践的工程管理,重点探讨了厂房和进水口的施工管理.通过对合江水电站存在的问题进行深入剖析,阐述了改造的必要性,提出了具体的改造方案.详细介绍了厂房和进水口的施工管理措施和方法,包括施工计划、进度控制、质量管理、安全管理等,并对施工方案进行了阐述.
Practice of Efficiency Enhancement and Capacity Expansion Renovation of Riverbed Power Station
This paper introduces the engineering management of the efficiency improvement and expansion renovation practice of Hejiang Hydropower Station,with a focus on the construction management of the factory building and water inlet.Through in-depth analysis of the problems existing in Hejiang Hydropower Station,it elaborates on the necessity of renovation and proposes specific renovation plans.This paper provides a detailed introduction to the construction management measures and methods for the factory building and water inlet,including construction plans,schedule control,quality management,safety management,etc.,and elaborates on the construction plan.

riverbed power stationefficiency enhancement and capacity expansion renovationwater conservancy engineeringengineering management

万来生

展开 >

梅州市水利水电勘测设计院有限公司,广东 梅州 514000

河床式电站 增效扩容改造 水利工程 工程管理

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(7)