Current Situation and Improvement Measures of Flood Control Operation in Shuangta Reservoir
Shuangta Reservoir plays a crucial role in the regional economic development of Guazhou.Based on the current situation of reservoir operation,flood control,flood control scheduling,and the existing problems in flood control scheduling,improvement measures for flood control scheduling in the future are proposed.It mainly includes delegating the opening authority of spillway 2 and merging it with spillway 1 for flood discharge,focusing on transitional period scheduling management,accelerating the construction of digital twin projects,and carrying out refined warning and forecasting,so as to achieve maximum flood control and benefits for the reservoir under limited conditions.