首页|基于QC小组活动的混凝土泵送堵管处理时间控制

基于QC小组活动的混凝土泵送堵管处理时间控制

扫码查看
依托昭通市宜昭高速公路A3项目洛泽河特大桥,采取QC小组活动的方式,开展问题解决型小组活动,通过采取因果分析图,从人、机、料、法、环、测等方面进行原因分析,对影响混凝土泵送堵管处理时间的因素提出针对性的措施,为洛泽河特大桥混凝土的连续性提供了保证,不仅提高了混凝土的施工质量,而且保证了项目的优质履约.
Time Control of Concrete Pumping Blockage Treatment Based on QC Group Activities
Based on the A3 project of Yizhao Expressway in Zhaotong City,Luozehe Extra Large Bridge is adopted QC group activities to carry out problem-solving group activities.By adopting a causal analysis diagram,the causes are analyzed from the aspects of human,machine,material,method,environment,and measurement,and targeted measures are proposed to address the factors that affect the treatment time of concrete pump blockage.It provides a guarantee for the continuity of the concrete of the Luoze River Grand Bridge,not only improving the construction quality of the concrete,but also ensuring the high-quality performance of the project.

Luozehe Extra Large BridgeQC grouppump blockageprocessing timecontinuity

王安肖、路飞、濮国轩、张春梅

展开 >

中国水利水电第十四工程局有限公司,云南 昆明 650041

洛泽河特大桥 QC小组 泵送堵管 处理时间 连续性

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(9)