Construction Organization and Management of Long-distance Water Transmission Ductile Iron Pipelines
This paper introduces the construction organization and management of the long-distance ductile iron pipeline for the Dehou Reservoir water transmission project.In the construction of the long-distance water transmission line,the entire line is reasonably divided into multiple sections.The earthwork foundation and rock foundation are divided into general sections,which adopt parallel and flow construction.The parts of the route that pass through villages,roads,farmland,high-pressure pipelines are divided into special sections.Special sections adopt corresponding construction organization methods based on their characteristics.By coordinating and planning personnel,equipment,materials,construction roads,slag yards,and adopting effective organizational and management measures,the construction period and cost can be effectively controlled.
long distanceductile iron pipeconstruction organizationadministration