Safety Construction Technology for 220 kV High Voltage Line Underground
There are dense transmission lines in the city.When implementing drilling and grouting piles,three-axis cement mixing piles,it involves operating equipment such as rotary drills,disc drills,and cranes.When overhead high-voltage power lines are located in the construction project area,there may be construction under the high-voltage lines,and certain safety and protective measures need to be taken to ensure the safety of construction under the high-voltage lines.
220 kVhigh voltage iron towerdeep foundation pittechnical measure