首页|悬臂翻升大型钢模板在韩江高陂水利枢纽大坝工程中应用

悬臂翻升大型钢模板在韩江高陂水利枢纽大坝工程中应用

扫码查看
介绍悬臂翻升模板在韩江高陂水利枢纽大模板混凝土浇筑施工中的应用.对翻转模板的受力进行了验算,包括荷载计算和拉杆计算,确保模板的稳定性和安全性,介绍了悬臂翻升模板体系在水坝施工中的具体应用过程.包括模板的安装、混凝土浇筑和模板的拆除.通过悬臂翻升模板的使用,实现了高效、安全、节约的施工方式,提高了施工效率和质量.
Application of Cantilever Lifting Large Steel Formwork in Hanjiang Gaobei Water Conservancy Hub Dam Project
This paper introduces the application of cantilever lifting formwork in the large formwork concrete pouring construction of Hanjiang Gaobei Water Conservancy Hub.It verifies the stress of the flipping formwork,including load calculation and tension rod calculation,to ensure the stability and safety of the formwork.It introduces the specific application process of the cantilever flipping formwork system in dam construction,including formwork installation,concrete pouring,and formwork removal.By using cantilever lifting templates,an efficient,safe,and cost-effective construction method has been achieved,improving construction efficiency and quality.

cantilever lifting templateHanjiang Gaobei Water Conservancy Hublarge formwork concrete pouringtemplate construction

林育佳

展开 >

广东水电二局集团有限公司,广东 广州 510000

悬臂翻升模板 韩江高陂水利枢纽 大模板混凝土浇筑 模板施工

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(11)