Excavation Dewatering and Anti-seepage Plan and Construction Quality Control for Jiangou Station
In the construction process of drainage stations,the issue of foundation pit dewatering and seepage prevention has a significant impact on the stability and safety of the entire project.In response to this issue,based on the project overview and the excavation method of the foundation pit of Jiangou Station,this article conducts an in-depth analysis of the dewatering and anti-seepage plan for the foundation pit of Jiangou Drainage Station,and proposes corresponding quality control measures.These measures include reasonable selection of drainage technology,construction technology of mixing pile anti-seepage wall,and strict control of the quality of the construction process.By implementing these measures,the problem of foundation pit dewatering and seepage prevention can be effectively solved,and the quality and safety of engineering construction can be improved.This research result has certain reference value for solving the problem of foundation pit dewatering and seepage prevention in water conservancy engineering.
excavation dewatering and anti-seepagedrainage technologymixing pile anti-seepage wallquality control