Research on the Repair Scheme and Treatment Effect of Anti seepage Panel for Reservoir Concrete Faced Rockfill Dam
This study takes Guangdong XFJ hydropower station as an example to conduct in-depth research on the anti-seepage panel repair scheme and treatment effect of the reservoir face rockfill dam.Firstly,it provides a detailed analysis of the engineering overview,operational background,and existing leakage and deformation issues of the hydropower station.Secondly,it proposes a comprehensive plan to address leakage and deformation issues,including key steps such as on-site inspection,design scheme formulation,and construction scheme formulation.Especially considering the construction under summer and winter temperature conditions,corresponding suggestions for mechanical utilization and shading measures have been proposed.Finally,the feasibility and effectiveness of the repair plan were verified through actual construction in the repair area.
concrete face rockfill damrepair of anti-seepage panelsdam settlement and deformationrepair plan