云南水力发电2024,Vol.40Issue(12) :16-20.DOI:10.3969/j.issn.1006-3951.2024.12.006

一级水源保护区超深竖井施工水质保护措施探讨

Discussion on Water Quality Protection Measures for Ultra Deep Vertical Shaft Construction in First-class Water Source Protection Area

龚超 严川 农秉军 董春磊
云南水力发电2024,Vol.40Issue(12) :16-20.DOI:10.3969/j.issn.1006-3951.2024.12.006

一级水源保护区超深竖井施工水质保护措施探讨

Discussion on Water Quality Protection Measures for Ultra Deep Vertical Shaft Construction in First-class Water Source Protection Area

龚超 1严川 1农秉军 1董春磊1
扫码查看

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

结合雁田水库一级水源保护区内雁田通风排水井临建、地下连续墙、竖井开挖等不同阶段施工,分析影响水源保护区水质的因素,研究相应的水质保护方案并予以验证,确保了竖井各阶段施工过程中无水质污染事件事故发生,总结水质保护的成果经验并提出合理化建议,避免水质污染事件发生.

Abstract

Based on the construction of temporary ventilation and drainage wells,underground continuous walls,and vertical shaft excavation in the first level water source protection area of Yantian Reservoir,this paper analyzes the factors that affect the water quality of the water source protection area,studies corresponding water quality protection plans,and verifies them.It ensures that there are no water pollution incidents or accidents during the construction process of each stage of the vertical shaft,summarizes the achievements and experiences of water quality protection,and puts forward rational suggestions to avoid water pollution incidents.

关键词

一级水源保护区/超深竖井/地下连续墙/水质保护措施/水质污染

Key words

first level water source protection area/ultra deep vertical shaft/underground continuous wall/water quality protection measure/water pollution

引用本文复制引用

出版年

2024
云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
段落导航相关论文