首页|红石岩堰塞坝运行初期防渗系统监测成果分析

红石岩堰塞坝运行初期防渗系统监测成果分析

扫码查看
红石岩堰塞坝为云南鲁甸"8·03"地震灾害经应急处置与整治利用后形成的综合水利枢纽工程.通过对红石岩堰塞坝防渗系统进行防渗墙内渗透压力、绕坝渗流和坝后渗流量监测,表明防渗系统运行正常,无异常渗流变化,堰塞坝总体防渗效果良好,同时可为后续堰塞坝渗流监测设计提供相关经验.
Analysis of Monitoring Results of Anti seepage System in the Initial Operation of Hongshiyan Dam
Hongshiyan Dam is a comprehensive water conservancy hub project formed after emergency response and remediation of the"8.03"earthquake disaster in Ludian,Yunnan.By monitoring the seepage pressure inside the anti-seepage wall,seepage around the dam,and seepage flow behind the dam of Hongshiyan Dam,it is shown that the anti-seepage system is operating normally without any abnormal seepage changes,and the overall anti-seepage effect of the dam is good.At the same time,it can provide relevant experience for the design of subsequent dam seepage monitoring.

landslide damanti-seepage systemseepage monitoringachievement analysis

黄张霖、冯燕明、施俊稳

展开 >

中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051

云南省水利水电工程安全重点实验室,云南 昆明 650051

堰塞坝 防渗系统 渗流监测 成果分析

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(12)