高地下水情况下超深入岩地下连续墙成槽施工技术

Construction Technology of Ultra Deep Rock Underground Continuous Wall Trenching under High Groundwater Condition

余江 王霞林 刘万冲
云南水力发电2024,Vol.40Issue(12) :78-81.DOI:10.3969/j.issn.1006-3951.2024.12.021

高地下水情况下超深入岩地下连续墙成槽施工技术

Construction Technology of Ultra Deep Rock Underground Continuous Wall Trenching under High Groundwater Condition

余江 1王霞林 2刘万冲1
扫码查看

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 2. 深圳市龙岗区平湖街道办事处,广东 深圳 518000
  • 折叠

摘要

介绍在高地下水位情况下,夹杂破碎带的硬岩地质中超深入岩地下连续墙竖井成槽施工的关键技术.具体措施为在竖井外围设置高压旋喷桩加帷幕灌浆进行止水防渗,提高成槽期间槽壁稳定性;利用旋挖钻、成槽机、冲击锤及铣槽机互相配合在不同地层中"引、抓、锤、铣"组合工艺成槽,提高硬岩破碎带中超深地连墙成槽施工效率,保障施工进度.

Abstract

This paper introduces the key technology for the construction of deep underground continuous wall vertical shafts in hard rock geology with mixed fractured zones under high groundwater levels.The specific measures are to install high-pressure rotary jet grouting piles and curtain grouting around the vertical shaft to prevent water and seepage,and improve the stability of the trench wall during the trenching period.By utilizing a combination of rotary drilling,slotting machines,impact hammers,and milling machines to create slotting in different geological formations,the construction efficiency of ultra deep connected wall slotting in hard rock fracture zones can be improved,ensuring construction progress.

关键词

超深地连墙/硬岩破碎地层/止水防渗、成槽工艺

Key words

ultra deep connected wall/hard rock fractured strata/waterproof and anti-seepage measure/trough