云南水力发电2024,Vol.40Issue(12) :89-91.DOI:10.3969/j.issn.1006-3951.2024.12.024

论高层建筑施工中不同支撑体系选择

Selection of Different Support Systems in High-rise Building Construction

宾红军 李志国 顾玉龙 朱玉 庹嘉伟
云南水力发电2024,Vol.40Issue(12) :89-91.DOI:10.3969/j.issn.1006-3951.2024.12.024

论高层建筑施工中不同支撑体系选择

Selection of Different Support Systems in High-rise Building Construction

宾红军 1李志国 1顾玉龙 1朱玉 1庹嘉伟1
扫码查看

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

针对常规外脚手架支撑体系在高层住宅施工过程中存在的安全隐患大、施工周期长及重复搭设、耗费时间长等不利因素,通过附着式升降脚手架从安装到使用过程的安全性能及经济性分析,得出了附着式升降脚手架具有模块化程度高,安全性能更优、一次成型快,减少重复性搭设,节省施工时间等优势,满足高层住宅施工的需求.

Abstract

Conventional external scaffolding support system has significant safety hazards,long construction periods,repeated erection,and time-consuming disadvantages in the construction process of high-rise residential buildings.This paper analyzes the safety performance and economy of attached lifting scaffolding from installation to use.The results show that the attached lifting scaffold has the advantages of high modularity,better safety performance,fast one-time molding,reduced repetitive erection,and saved construction time,meeting the needs of high-rise residential construction.

关键词

高效安全/附着式升降脚手架/高层建筑/模块化程度

Key words

efficient and secure/attachment type lifting scaffold/high-rise building/modularity level

引用本文复制引用

出版年

2024
云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
段落导航相关论文