A Construction Method for Formwork Reinforcement in Shear Wall Construction
In the construction of reinforced concrete shear walls,quality defects such as honeycombing,pockmarks,and mold bursting are often unavoidable.Especially in rooms with high waterproofing requirements such as electrical rooms,concrete defects have a greater impact on waterproofing and other related performance.In order to enhance the reinforcement ability of the tension screw and improve the self waterproofing performance of the wall,the straight section length of the three-stage tension screw is increased,and a waterproof copper sheet is added to block the transmission path,thereby achieving the effect of improving the waterproof performance.At the same time,the three-stage structure can effectively enhance the ability to recycle the pull rod,achieving the effect of resource conservation.