江新环城联围排涝能力提升下的泵闸建设实践

扫码查看
江新联围属现状排涝能力较弱,不满足防洪排涝要求,针对联围现有的穿堤建筑和堤防,新建旭涛电子电排站,泵站选用堤后式布置型式,储水池左岸采用格宾笼挡墙.地基处理采用预应力管桩地基处理方案,并对基础进行了稳定抗浮复核.提出了泵站的施工方案.
Practice of Pump and Sluice Construction under the Improvement of Drainage Capacity of Jiangxin Ring Road
The current drainage capacity of Xinlianwei is weak and does not meet the requirements of flood control and drainage.A new Xutao electric drainage station has been built in response to the existing through embankment buildings and embankments.The pump station adopts a post embankment layout,and the left bank of the water storage tank adopts a gabion cage retaining wall.The foundation treatment adopts a prestressed pipe pile foundation treatment scheme,and the stability and anti floating review of the foundation is carried out.A construction plan for the pump station has been proposed.

pump stationflood control and drainageground foundationstability analysis

梁培林

展开 >

江门市新会区会城街道农业综合服务中心,广东 江门 529000

泵站 防洪排涝 地基基础 稳定分析

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(12)