Practice of Pump and Sluice Construction under the Improvement of Drainage Capacity of Jiangxin Ring Road
The current drainage capacity of Xinlianwei is weak and does not meet the requirements of flood control and drainage.A new Xutao electric drainage station has been built in response to the existing through embankment buildings and embankments.The pump station adopts a post embankment layout,and the left bank of the water storage tank adopts a gabion cage retaining wall.The foundation treatment adopts a prestressed pipe pile foundation treatment scheme,and the stability and anti floating review of the foundation is carried out.A construction plan for the pump station has been proposed.
pump stationflood control and drainageground foundationstability analysis