首页|新型墙体模具无支架法在高挡墙施工中的应用

新型墙体模具无支架法在高挡墙施工中的应用

扫码查看
以藻渡水库先期工程进场道路地质情况复杂、受地形限制大的高挡墙施工为研究对象,从新型墙体模具结构、施工工艺及实施操作要点几方面着手,通过一系列技术措施的实施,总结了新型墙体模具无支架法施工高挡墙技术.采取无支架施工方案,受地形限制小,减少施工难度,显著改善了传统模式的不足之处,降低了人工成本.
Application of a New Type of Wall Mold without Support Method in the Construction of High Retaining Walls
This paper takes the construction of high retaining walls on the access road of the early stage project of Zaodu Reservoir,which has complex geological conditions and is greatly restricted by terrain,as the research object.Starting from the new wall mold structure,construction technology,and implementation points,a series of technical measures are implemented to summarize the high retaining wall construction technology of the new wall mold without support.Adopting a scaffolding free construction plan with minimal terrain limitations reduces construction difficulty,significantly improves the shortcomings of traditional methods,and reduces labor costs.

high retaining wallnew type of moldmethod without supportconstruction technology

郭召东、王星、徐春成、梁宗磊、朱森晖

展开 >

中国水利水电第十四工程局有限公司,云南 昆明 650041

高挡墙 新型模具 无支架法 施工技术

2024

云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
年,卷(期):2024.40(z1)
  • 10