隧洞开挖过程中突遇洞顶塌方原因分析及处理办法
Cause Analysis and Treatment Methods for Sudden Collapse of Tunnel Roof during Tunnel Excavation Process
王正达 1张春旭 1王成燕 1黄国涛 1丁玉宸1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
隧洞开挖支护过程中常因各种原因造成塌方,除了事前加强预报预防外,更应注重塌方后如何有效地组织塌方处理.在保证安全与质量的前提下加快处理进度,使工期损失与资金投入降到最低.通过对滇中引水石鼓水源工程通风管道洞开挖过程中发生塌方原因的分析与处理方法阐述,为后续同类型隧洞塌方处理提供技术支撑.
Abstract
During tunnel excavation and support,landslides are often caused by various reasons.In addition to strengthening prediction and prevention in advance,more attention should be paid to how to effectively organize landslide treatment after collapse.Accelerating the processing progress while ensuring safety and quality can minimize project losses and capital investment.This paper analyzes the causes of collapse during the excavation process of the ventilation pipeline tunnel in Shigu Water Source Project of Dianzhong Water Diversion,and describes the treatment methods,providing technical support for the subsequent collapse treatment of similar tunnels.
关键词
隧洞/塌方处理/拱架加强支护/回填灌浆Key words
tunnel/collapse treatment/arch reinforcement support/backfilling grouting引用本文复制引用
出版年
2024