Comparison and Selection of Treatment Plans for Coal Caves on Reservoir Bank Slopes
This paper focuses on the artificial cave problem encountered during the construction of Lawudi Reservoir in Chuxiong City,and studies the treatment plan and investment situation of the reservoir bank slope.The location of Lawudi Reservoir is located in a location with coal caves,which may affect the stability of the bank slope,leading to bank slope collapse and reservoir leakage after water storage.To address these issues,different solutions have been proposed.Finally,an appropriate coal mine treatment plan was chosen and an investment estimate was made.The research findings emphasize the importance of preliminary survey work.
bank slope stabilityhigh density electrical method testcave treatmentleakage problem