Calculation Analysis and Research on Safety Assessment of a Water Storage Facility in a Shenzhen Project
To study the impact of the project on the reservoir,this article conducts a review calculation,protection scheme analysis,and comprehensive evaluation of the stability of the flood discharge channel when the project enters the reservoir management and protection scope,and proposes prevention and remedial measures.The results show that the current flood discharge channel meets the requirements of displacement and settlement,and the engineering structure has good stability.The project implementation has little impact on the stability of the flood discharge channel during the construction and operation periods,does not affect the safety of reservoir flood discharge,does not affect the water conservancy planning related to water engineering,and does not affect the legitimate water rights and interests of other third parties.