云南冶金2024,Vol.53Issue(1) :42-50.

某采场上向水平分层进路充填采矿法结构参数研究

Structure Parameter Study of Upward Horizontal Sub-level Drift Fill Stoping Method of one Stope

肖欢 李绍斌 刘银 周宗红 张晶 侯廷凯
云南冶金2024,Vol.53Issue(1) :42-50.

某采场上向水平分层进路充填采矿法结构参数研究

Structure Parameter Study of Upward Horizontal Sub-level Drift Fill Stoping Method of one Stope

肖欢 1李绍斌 1刘银 1周宗红 2张晶 2侯廷凯2
扫码查看

作者信息

  • 1. 鹤庆北衙矿业有限公司,云南大理 671507
  • 2. 昆明理工大学国土资源工程学院,云南昆明 650031
  • 折叠

摘要

上向水平分层进路充填采矿法采场结构参数越大,回采效率越高,但过大的结构参数使采场稳定性难以保证,该方法采场结构参数优化的重点应集中于进路断面尺寸的优选.通过经数值模拟和Mathews稳定性图解法分析,从经济、合理开采资源方面出发,最终推荐进路断面尺寸.

Abstract

When the structure parameters of upward horizontal sub-level drift fill stoping methods are bigger,the stoping efficiency is higher,but the stope stability can not be guaranteed because of the excessively large structure parameters,the optimization focus of stope structure parameters shall be on the selection of drift cross-sectional dimension.The numerical simulation and Mathews stability graphical analysis were carried out from the aspects of the economy,rational exploitation of resources,and the drift cross-sectional dimension was recommended finally.

关键词

上向水平分层进路充填采矿法/数值模拟/Mathews/断面尺寸

Key words

upward horizontal sub-level drift fill stoping method/numerical modeling/Mathews/cross-sectional dimension

引用本文复制引用

出版年

2024
云南冶金
云南省金属学会 昆明冶金研究院

云南冶金

影响因子:0.537
ISSN:1006-0308
参考文献量13
段落导航相关论文