In the production operation of pot calciner,the temperature of the first and the second layer is hard to increase,"deflagration"occurs frequently,the lifetime of silica bricks for pot calciner is short,it cannot meet the designed capacity requirements,so a series improvement measures were taken,such as optimization of pre-heat air passages,collection of waste gas,precise ingredient of petroleum coke,and the daily operation of top calciner was regulated,the first and the second layer of top calciner is increased more than 50℃,"deflagration"is eliminated basically,and now the capacity of single pot break through the design value by 100 kg/h.
关键词
煅烧炉/产量/温度/放炮/硫含量/硅砖/使用寿命
Key words
calciner/capacity/temperature/deflagration/sulfur content/silica bricks/life time