Optimization and Adjustment Measures and Effect Analysis of Crude Oil Gathering and Transportation System in XB Oilfield
With the continuous deepening of development,XB Oilfield is facing difficulties in build-ing production efficiency,aging,low efficiency,and high consumption of surface gathering and trans-portation system stations.In accordance with the overall deployment of the oilfield company's optimiza-tion and simplification,XB Oilfield focuses on creating an optimization and simplification model with XB characteristics.Through the optimization concept of"optimal utilization of water flooding,water polymer flooding co-construction and control increment,system adjustment and optimization layout,and process simplification to increase efficiency",the remaining capacity of stations in A Area is fully tapped,and new water flooding production capacity is accepted.Combining the characteristics of staggered production capacity layout of water polymer flooding in B Area,the co-construction of wa-ter polymer flooding is implemented.In response to the problem of low efficiency and low load in C Area,the regional system layout is optimized,and the number of stations is reduced.The"parallel production+double pipe circular"gathering and transportation process is explored for the construction of D Block large platform.On the premise of the increasing of oil wells,the number of oil transfer stations is reduced,the load of the gathering and transportation system is increased,and the construction investment is controlled,which can provide guidance for the optimization and simplification of subsequent gathering and transportation systems.
benefit productionaginglow efficiencyoil transfer stationoptimization and simplifi-cationexpansion and reconstruction