Ecological Environment Protection Practice of West-East Gas Transmission Pipeline Third Line Seventh Section Project Qinling Area
West-East gas transmission pipeline third line seventh section project crosses the Qinling mountains environmentally sensitive area,which is rich in biodiversity,has a high vegetation coverage rate,and is an important water source.Therefore,the requirements for environmental protection during the construction process of the project are very high.Based on the characteristics of the project construction and the surrounding environmental conditions,the article proposes feasible organizational,management,and technical measures for the protection of the ecological environment from aspects such as the formulation of special plans,prevention of soil and water erosion,prevention of water pollution,prevention of pollution from equipment and facilities,and prevention of pollution from toxic and hazardous solid waste.This has minimized the impact of the project construction on the surrounding environment and ensured that the green and environmentally friendly work of the project is carried out smoothly and orderly.At the same time,the article analyzes the existing shortcomings in the current work and points out the need to strengthen aspects such as construction plan optimization,vegetation restoration,energy conservation and emission reduction,technological innovation,and publicity and training in the next steps.
long distance pipelineenvironmental protectionsoil and water conservationsolid wastetreatment