首页|1800m3高炉上料卷扬电控系统改造实践研究

1800m3高炉上料卷扬电控系统改造实践研究

扫码查看
本文主要介绍了1800 m3高炉上料卷扬电控系统改造实践.重点对上料卷扬电控系统的传动控制部分进行了论述.本文也阐述了 1800 m3高炉上料卷扬电控系统改造过程中遇到的困难、调试的重点难点问题等内容,通过改造前后的对比,阐述了改造的意义及效果,为后期其他高炉的改造奠定了基础.
1800 m3 Practice of Reforming the Electric Control System of Blast Furnace Charging Winch
This article mainly introduces the practice of the electrical control system transformation for the charging winch of a 1800 m3 blast furnace,focusing on the discussion of the transmission control section of the charging winch electrical control system.It also elaborates on the difficulties encountered during the transformation process,the key and challenging issues in debugging,and other content.Through a comparison between before and after the transformation,the significance and effects of the transformation are elaborated,laying a foundation for the transformation of other blast furnaces in the future.

charging winchelectrical control systemtransmission controltransformation practice

余高文、李平、郑威、王海龙

展开 >

甘肃酒钢集团宏兴股份公司炼铁厂,甘肃嘉峪关 735100

上料卷扬 电控系统 传动控制 改造实践

2024

仪器仪表用户
天津仪表集团有限公司,中国仪器仪表学会节能技术应用分会

仪器仪表用户

影响因子:0.255
ISSN:1671-1041
年,卷(期):2024.31(5)