1800 m3 Practice of Reforming the Electric Control System of Blast Furnace Charging Winch
This article mainly introduces the practice of the electrical control system transformation for the charging winch of a 1800 m3 blast furnace,focusing on the discussion of the transmission control section of the charging winch electrical control system.It also elaborates on the difficulties encountered during the transformation process,the key and challenging issues in debugging,and other content.Through a comparison between before and after the transformation,the significance and effects of the transformation are elaborated,laying a foundation for the transformation of other blast furnaces in the future.
charging winchelectrical control systemtransmission controltransformation practice