电力装置作为铁塔与配网输电线路之间的关键连接部件,在保障输电线路安全运行方面发挥着重要作用.因此本文以 500 kV输电线路为研究对象,对重冰区电力装置进行研究.实验结果表明,线路A3 的动态张力在工况④的条件下达到最小,为 63.22 kN.而线路A2 的动态张力在工况③的条件下达到最大,为 77.58 kN.在稳定的风力和冰雪载荷作用下,电力装置拉线在X、Y、Z三个方向上都有位移,并绕Y轴和Z轴旋转.在X-Y平面上,悬索在X方向的位移范围为-0.75~80.73 mm.在Y-Z平面上,悬垂绝缘子串在Z轴方向上的位移范围为-106.30~2.30 mm.在冰脱落后的前30 s,每根输电线路悬挂点的动态张力波动很大,并呈现急剧衰减的趋势.在30~60 s,则要缓慢得多.
Research and Analysis on the Dynamic Response of Power Devices After Automatic De-icing of Distribution Network Transmission Lines
As a critical connecting component between the tower and the distribution network transmission lines,power devices play a significant role in ensuring the safe operation of transmission lines.Therefore,this paper takes the 500 kV transmission line as the research object to study the power devices in heavy icing areas.The experimental results show that the dynamic tension of line A3 reaches its minimum value of 63.22 kN under condition ④.In contrast,the dynamic tension of line A2 reaches its maximum value of 77.58 kN under condition ③.Under stable wind and ice-snow loads,the power device guy wires exhibit displacement in the X,Y,and Z directions and rotate around the Y-axis and Z-axis.In the X-Y plane,the displacement range of the suspension cable in the X-direction is-0.75 to 80.73 mm.In the Y-Z plane,the displacement range of the suspended insulator string in the Z-direction is-106.30 to 2.30 mm.Within the first 30 seconds after ice shedding,the dynamic tension fluctuations at the suspension points of each transmission line are significant and show a rapid decay trend.However,from 30 to 60 seconds,the fluctuations are much slower.

distribution network transmission linesautomatic de-icingpower devicesfinite element model

李卫国

展开 >

国网山东省电力公司济南市历城区供电公司,山东济南 250014

配网输电线路 自动化除冰 电力装置 有限元模型

2024

仪器仪表用户
天津仪表集团有限公司,中国仪器仪表学会节能技术应用分会

仪器仪表用户

影响因子:0.255
ISSN:1671-1041
年,卷(期):2024.31(6)